Županja
East Croatia, biogas power plant administrative building 34,915 m² East Croatia, biogas power plant built in 2019, located on a land area of 34,915 m². Adjacent to the plant is an administrative building with six rooms: a control room, analysis room, meeting room, kitchen, restroom, and bathroom with a shower. The premises are heated by gas produced through... More on eurovilla.hr, ID: 601739
REC ID: 1121499